Events (14226)

Date Time (utc) Region Magnitude Depth (km) Latitude Longitude Mode Map
22/07/2018 12:08:04 Hindu Kush Region, Afghanistan 4.9 163 36.55 N 70.99 E M -
22/07/2018 12:08:02 Hindu Kush Region, Afghanistan 4.3 184 36.53 N 70.97 E M -
22/07/2018 10:07:27 Western Iran 5.9 17 34.65 N 46.18 E A -
22/07/2018 07:54:43 Hindu Kush Region, Afghanistan 3.8 100 36.96 N 70.37 E A -
22/07/2018 06:27:56 Afghanistan-Tajikistan Border Region 4.2 154 36.40 N 71.08 E M -
22/07/2018 05:07:03 Southern Iran 5.4 10 27.66 N 54.85 E A -
22/07/2018 05:05:03 Southern Iran 4.8 22 28.31 N 54.68 e A -
22/07/2018 01:32:28 Hindu Kush Region,Afghanistan 3.6 100 36.89 N 71.18 E M -
21/07/2018 22:45:53 Afghanistan-Tajikistan Border Region 3.9 79 36.46 N 71.24 E M -
21/07/2018 22:42:36 Hindu Kush Region,Afghanistan 3.6 100 36.21 N 70.98 E M -
21/07/2018 21:28:43 Hindu Kush Region, Afghanistan 3.9 150 36.44 N 71.01 E M -
21/07/2018 21:28:42 Afghanistan-Tajikistan Border Region 4.2 91 36.47 N 71.01 E M -
21/07/2018 20:56:23 Southeast Indian Ridge 5.4 10 48.41 S 99.38 E A -
21/07/2018 19:37:45 43Km NE of Muzaffarabad 3.9 26 34.45 N 73.92 E M -
21/07/2018 19:37:16 Eastern Kashmir 4.1 380 35.87 N 75.42 E M -

Introduction

Pakistan Meteorological Department (PMD) holds the responsibility for seismic monitoring and tsunami early warning in Pakistan. It is the liability of the PMD to disseminate earthquake information to Government, non Government organization and to public after the occurrence of any event. The seismic monitoring technologies have been rapidly changed in the world. The seismic monitoring equipments have changed from analogue to digital technology. This enhanced the capability of the monitoring equipments.

PMD had been using paper recording equipments since 1954. The 2004 Indonesian earthquake of M 9.4 which generated disastrous Tsunami and subsequently Muzaffarabad Kashmir earthquake of M 7.6 were the wake up call not only for Pakistan but also for the whole world. During the past few years PMD has enhanced multifold its abilities to monitor seismic activity. Since 2005, PMD upgraded and replaced all analogue seismic equipment with state of the art technology.

Objectives

Earthquakes

Detect, identify and locate earthquakes and monitor seismic activities.

Quick Response

Give quick response to queries pertaining to earthquakes and seismology.

Information

Exchange information pertaining to seismology with international agencies.

Research

Provide assistance in Seismological studies and research in related fields.

Instruments

...
...
...
...