Events (16690)

Date Time (utc) Region Magnitude Depth (km) Latitude Longitude Mode Map
15/04/2022 01:26:18 Qinghai, China 5.3 51 38.53 N 97.27 E A -
12/04/2022 11:20:16 Hindu Kush Region,Afghanistan 5.3 122 36.50 N 69.85 E M -
11/04/2022 01:41:36 Northern India 5.3 34 31.80 N 75.24 E M -
11/04/2022 01:29:38 102 Km SE of Skardu 4.7 97 34.58 N 76.41 E M -
07/04/2022 11:42:22 27 Km South of Skardu 4.3 112 35.05 N 75.60E M -
06/04/2022 04:54:09 Tajikistan-Xinjiang Border Region 4.4 149 37.64 N 74.90 E M -
04/04/2022 17:43:26 Hindu Kush Region,Afghanistan 4.7 197 36.54 N 70.98 E M -
03/04/2022 22:58:41 Hindu Kush Region,Afghanistan 4.5 157 36.42 N 70.38 E M -
31/03/2022 07:22:09 Northwestern Kashmir 4.4 52 35.56 N 74.89 E M -
25/03/2022 10:51:31 Off Coast of Pakistan 3.9 15 24.73 N 61.72 E M -
24/03/2022 08:32:17 Kashmir-India Border Region 3.0 5 32.24 N 75.96 E M -
23/03/2022 01:29:17 Northwestern Kashmir 4.0 10 35.63 N 75.20 E M -
22/03/2022 20:11:35 Northwestern Kashmir 4.0 10 35.74 N 75.12 E M -
22/03/2022 18:14:34 Hindu Kush Region,Afghanistan 4.2 169 36.57 N 69.73 E M -
22/03/2022 14:23:44 Hindu Kush Region,Afghanistan 4.2 92 36.10 N 70.98 E M -

Introduction

Pakistan Meteorological Department (PMD) holds the responsibility for seismic monitoring and tsunami early warning in Pakistan. It is the liability of the PMD to disseminate earthquake information to Government, non Government organization and to public after the occurrence of any event. The seismic monitoring technologies have been rapidly changed in the world. The seismic monitoring equipments have changed from analogue to digital technology. This enhanced the capability of the monitoring equipments.

PMD had been using paper recording equipments since 1954. The 2004 Indonesian earthquake of M 9.4 which generated disastrous Tsunami and subsequently Muzaffarabad Kashmir earthquake of M 7.6 were the wake up call not only for Pakistan but also for the whole world. During the past few years PMD has enhanced multifold its abilities to monitor seismic activity. Since 2005, PMD upgraded and replaced all analogue seismic equipment with state of the art technology.

Objectives

Earthquakes

Detect, identify and locate earthquakes and monitor seismic activities.

Quick Response

Give quick response to queries pertaining to earthquakes and seismology.

Information

Exchange information pertaining to seismology with international agencies.

Research

Provide assistance in Seismological studies and research in related fields.

Instruments

...
...
...
...