Events (16690)

Date Time (utc) Region Magnitude Depth (km) Latitude Longitude Mode Map
29/10/2022 10:57:42 87 KM East of Bela 3.9 11 26.31 N 67.20 E M -
29/10/2022 04:13:06 Afghanistan-Tajikistan Border Region 3.8 50 36.39 N 71.42 E M -
29/10/2022 04:13:04 Afghanistan-Tajikistan Border Region 3.7 127 36.33 N 71.46 E M -
25/10/2022 17:17:48 56 KM East of Hyderabad 3.5 14 25.52 N 68.93 E M -
25/10/2022 16:54:22 67 Km Southwest of Nawabshah 4.5 15 26.07 N 67.69 E M -
25/10/2022 08:41:06 Tajikistan 3.4 40 37.82 N 72.92 E M -
24/10/2022 00:48:34 Afghanistan-Tajikistan Border Region 3.8 110 37.28 N 71.95 E M -
23/10/2022 16:25:33 Southeastern Afghanistan 3.5 120 34.45 N 69.80 E M -
23/10/2022 15:07:05 Southern Xinjiang, China 5.4 185 37.73 N 77.47 E M -
23/10/2022 14:24:51 Tajikistan-Xinjiang Border Region 4.9 145 37.26 N 74.73 E M -
23/10/2022 11:02:07 26 KM Northeast of Mardan kpk 2.6 10 34.39 N 72.24 E M -
22/10/2022 18:16:55 Mid Indian Ridge 5.0 36 28.43 N 74.34 E A -
22/10/2022 04:14:17 15 Km West of Haripur kpk 2.4 24 34.03 N 72.75 E M -
21/10/2022 13:02:41 Southeastern Afghanistan 3.2 101 34.66 N 70.61 E M -
21/10/2022 04:07:19 Hindu Kush Region,Afghanistan 4.1 91 36.59 N 70.15 E M -

Introduction

Pakistan Meteorological Department (PMD) holds the responsibility for seismic monitoring and tsunami early warning in Pakistan. It is the liability of the PMD to disseminate earthquake information to Government, non Government organization and to public after the occurrence of any event. The seismic monitoring technologies have been rapidly changed in the world. The seismic monitoring equipments have changed from analogue to digital technology. This enhanced the capability of the monitoring equipments.

PMD had been using paper recording equipments since 1954. The 2004 Indonesian earthquake of M 9.4 which generated disastrous Tsunami and subsequently Muzaffarabad Kashmir earthquake of M 7.6 were the wake up call not only for Pakistan but also for the whole world. During the past few years PMD has enhanced multifold its abilities to monitor seismic activity. Since 2005, PMD upgraded and replaced all analogue seismic equipment with state of the art technology.

Objectives

Earthquakes

Detect, identify and locate earthquakes and monitor seismic activities.

Quick Response

Give quick response to queries pertaining to earthquakes and seismology.

Information

Exchange information pertaining to seismology with international agencies.

Research

Provide assistance in Seismological studies and research in related fields.

Instruments

...
...
...
...